Pine Brook Water District Storage Tank Rehabilitation

Project Information

  • Location: Boulder, CO
  • Contact: Robert deHaas
  • Contract Amount: $368,900
  • Date Awarded: June 21st, 2018
  • Performance Period: Sept. 2018 – Oct. 2018, May 2019 – August 2019
  • Engineering Firm: Stantec, Inc.

Pine Brook Water District Storage Tank R2 and R3 Rehabilitation

Interior Abrasive Blast to SSPC-SP 10 on two ground storage tanks, exterior spot powertool
with lead abatement/encapsulation overcoat. Temporary storage tank system installed by Principle to maintain service within acceptable levels during the course of the project. Larger of the two tanks was located on a mountain-top with minimal access. Creative solutions were developed to move equipment and materials to the project site. Performing abrasive blasting/recycling over a ¼ mile from the nearest vehicular access point.
Coatings included application of Tnemec products.

Owner:

Pine Brook Water District – 1903 Linden Dr, Boulder, CO 80304