Harrison 750,000 Gal. Elevated Tank Repair and Repaint

Project Information

  • Location: Sherman, TX
  • Contact: Jerry Pace
  • Contract Amount: $698,084
  • Date Awarded: June 28, 2016
  • Performance Period: Oct. 2016 – May 2017
  • Engineering Firm: Freeman-Millican, Inc – David E. Gettis, P.E.

Harrison 750,000 Gal. Elevated Tank Repair and Repaint

Interior and Exterior Abrasive Blast and Recoat of 750,000 gal EST. Project included significant repairs to tank, including pit welding, patching of corroded structural steel installation of pressure-vents, hatches, manways, ladders with fall-protection systems, handrails, and inlet/drain piping. Coating system included application of Carboline Reactamine 760 Polyurethane Hybrid 100% solids on the interior, and Carboxane 950 Fluorourethane on the exterior. Project included design and installation of full TEPE Containment System.

Owner:

City of Sherman, TX

Construction Company

If you have any construction & renovation work need, simply call our 24 hour emergecny number.
727-940-9541 or Contact Us